Skip to content

Bump actions/setup-node from 5 to 6 #55

Bump actions/setup-node from 5 to 6

Bump actions/setup-node from 5 to 6 #55

Triggered via pull request November 14, 2025 18:19
Status Failure
Total duration 1m 16s
Artifacts

test.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Node 20
Process completed with exit code 1.
Node 24
The strategy configuration was canceled because "test._20" failed
Node 24
The operation was canceled.
Node 22
The strategy configuration was canceled because "test._20" failed
Node 22
The operation was canceled.