chore: naming connect procedure #5687
Triggered via pull request
October 29, 2024 15:31
Status
Cancelled
Total duration
1m 10s
Artifacts
–
ci.yml
on: pull_request
changes
6s
Matrix: build-docker-image / build-docker-image
Matrix: build
Matrix: test
Lint
0s
Annotations
10 errors and 3 warnings
test-ubuntu-22.04
Canceling since a higher priority waiting request for 'ci-chore-refactor-connections' exists
|
test-ubuntu-22.04
The operation was canceled.
|
build-docker-image / docker-build-ubuntu-22.04
Canceling since a higher priority waiting request for 'ci-chore-refactor-connections' exists
|
build-docker-image / docker-build-ubuntu-22.04
The operation was canceled.
|
test-macos-13
Canceling since a higher priority waiting request for 'ci-chore-refactor-connections' exists
|
test-macos-13
The operation was canceled.
|
build-macos-13
Canceling since a higher priority waiting request for 'ci-chore-refactor-connections' exists
|
build-macos-13
The operation was canceled.
|
build-ubuntu-22.04
Canceling since a higher priority waiting request for 'ci-chore-refactor-connections' exists
|
build-ubuntu-22.04
The operation was canceled.
|
changes
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/checkout@v3, dorny/paths-filter@v2. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
|
test-ubuntu-22.04
The process '/usr/bin/git' failed with exit code 128
|
build-docker-image / docker-build-ubuntu-22.04
The process '/usr/bin/git' failed with exit code 128
|